Innovative Remediation Strategies Achieves Client’s Goals and Cost Savings
Auxier decommissioned, decontaminated, and demolished a former rare earth minerals processing plant in a larger chemical manufacturing complex.
The site was approved for closure by the USEPA in 2015. Modeling was used to determine remediation goals for allowable soil concentrations to meet the regulatory requirement, which resulted in soil concentrations equal to 3 pCi/g of thorium-232 and 9 pCi/g uranium-238.
Approximately 100,000 tons of radiologically impacted soil, sediment, construction debris, and 230,000 gallons of impacted water have been removed from the facility by rail, truck, and tanker. Waste from the facility has been disposed of at four different facilities across the continental U.S. based on its radiological contamination levels.
Work Performed
- A 1,500-sample characterization plan was conducted pre-excavation of the 13-acre site
- Impacted structures, roadways, and paved surfaces were surveyed, demolished, and sorted for disposal based on radiological activity
- A 1-acre, 5-million-gallon temporary fire water pond was constructed and lined with HDPE to supply the required fire protection, while the 2.5-acre Fire Water Pond was remediated
- 4 wastewater processing ponds that contained NORM-impacted sediments were dewatered, characterized, and transported for disposal while keeping the ponds in service; each pond was reconstructed with new clay and synthetic liners
- 3,500 linear feet of storm sewer were hydro-blasted with combination air-movers; radiological gamma surveys were conducted in-situ upon completion
- A 5,000-square-feet laboratory was demolished; multiple chemicals and lab equipment were either recycled or transported for disposal
- All areas are sampled after excavation, and an area-wide GPS gamma survey is collected for MARSSIM closure/final status survey
Providing Value to our Client
- Saved approximately $1M on disposal costs by using an in-state disposal facility instead of an out-of-state disposal facility
- Gained concurrence with state agencies to allow lower activity material to be disposed of in local landfills for transportation cost savings
- Material was analyzed in the onsite ISOCS lab for disposal characterization, saving on time and costs for analysis
- Pond sediment was sampled in-situ for disposal profiling; material was solidified onsite and loaded directly into 20-yard tractor-trailer dump trucks, saving on material storage, transportation, and disposal costs.
- Tarps were used to control collecting and preventing rainwater from becoming impacted in excavations and in fluxing the groundwater during storm events; limited cross-contamination and saved approximately $4,800 per month on water disposal costs
- Through detailed site characterization and negotiations with state regulators, a project variance allows a gradient scale for final material retention on site; saving time and disposal costs
Multi-Phase Remediation and Restoration Creates Pond, Wetlands, and Walking Trails Auxier and ENTACT are performing an ecological restoration of 100+ acres previously home to several chemical manufacturers, a clay mining operation, and […]
Four Phase Project Restores Site, Wetlands, Stream, and Wooded Area Auxier and ENTACT were engaged to perform a four-phased remedial action project to support the decommissioning of this former glass and super […]
Former Mine Site Restoration Completed Ahead of Schedule with an Emphasis on Worker Safety ENTACT conducted three remedial actions at a former copper mine site in Nevada. The remediation required the removal […]